been issued by the Government of India. The
Original Equipment Manufacturer [OEM] of the petitioner has duly certified about RoHS
compliance of the product ... particular form of certificate.
As such, a compliance statement from the OEM ought to have been held as sufficient.
In so far as the ground
prospective bidders and the queries received from various Original
Equipment Manufacturers (OEMs) and System Integrators. After discussion, the Technical
Evaluation Committee was of the opinion ... Corrigendum in respect of various technical points and to attract more OEMs and System
Integrators. Accordingly, the Technical Evaluation Committee recommended amendments on
a number
respondent no. 5 having claimed to be an Original Equipment Manufacturer (OEM), it
could not have shared the OEM documents of another company before ... before which the
respondent no. 5 has declared itself to be an OEM. In view of such declaration, it was
mandatory on the part
Turn Over Certificate from CA (last 3 years)-2 Cr, 4.
Bidder/OEM (themselves or through resellers) Past Experience (3 Year), 5.
USFDA ... trained service engineers based at Assam.
Model : VITAL WAVE
3.Bidder/OEM did not submit past
experience documents.
4.Bidder did not submit EU Certificate
Service & Support
Dedicated/toll Free Telephone No. for Service Support: BIDDER/OEM must have
Dedicated/toll Free Telephone No. for Service Support.
23. Service ... Support
Escalation Matrix For Service Support: Bidder/OEM must provide Escalation Matrix of
Telephone Numbers for Service Support. "
Though the petitioner had uploaded
bidder must be the "original equipment
manufacturer" (OEM for short) of mast, substructure and crown block
assembly for rig of tendered or higher ... which requires that the bidder has to be either the
manufacturer (OEM) of Mast, Substructure and Crown-block assembly for rig of
tendered or higher
General Reserve Engineer Force, petitioner no.1 as Operator Excavating Machine
(OEM) and petitioner no.2 was working as MSW PNR in the Eastern Base ... respondent authorities thorough a letter dated 02.09.2024, replied that the post
of OEM which petitioner no.1 was holding was not present in some
General Reserve Engineer Force, petitioner no.1 as Operator Excavating Machine
(OEM) and petitioner no.2 was working as MSW PNR in the Eastern Base ... respondent authorities thorough a letter dated 02.09.2024, replied that the post
of OEM which petitioner no.1 was holding was not present in some
with other maintenance of AC units on NFR is being done
through OEM contracts and a conscious decision has been taken
already during the past ... remain with OEM.
Page No.# 7/10
Since it is only in the case of GHY that ACCEA is not bundled with the
maintenance work
reproduced herein under:-
"5. Past Performance: The Bidder or its OEM {themselves or through re-
seller(s)} should have supplied same or Similar Category ... said Clause 5 would show that the bidder or its
OEM (themselves or through re-sellers) should have supplied the same
Page