clauses 5.1.4 and 8.5.2 of the MDG, the independent opinion of OEM was not obtained and the dealership was terminated solely on assumption and presumptions ... alleged Tampering or even independent opinion of W & M department and OEM as mandated in the clause
officials of the Weight and Measurement Department as well as OEM (Original Equipment Manufacturer) Service Engineer. During the Stamping procedure, no irregularity was found ... officials of the Weights and Measurement Department as well as OEM (Original Equipment Manufacturer) Service Engineer during 'STAMPING' procedure no irregularity was found
Registration of foreign
Original Equipment Manufacturers (hereinafter referred to as 'OEM') and
vendors was prescribed and regulated by Clause 9.3 of the Manual ... terms of Clause 9.3 of the Manual, enjoins that only foreign OEMs and
vendors could participate for the present. It was projected that such
situation
were to be manufactured by seven named original equipment
manufacturers (hereinafter, "OEMs"). The contention of the petitioner
was that it also possessed technologies ... Sotefin SA submitted
its bid who is the one of the OEMs for fully automated
robo-shuttle type automated car parking system. From
this fact
other objections i.e., that the original
equipment manufacturer‟s (hereinafter, "OEMs") website, i.e. that of
Thermo Fishers Scientific ... that the specifications are not on the website or portal of the OEM.
5. So far as the serialisation of documents is concerned, there
Commission could invoke its powers alter the
MYT norms for SHR and OEM cost, if required.
4.5.6
The Commission is of the view that norms ... CPRI report observes that:
“vii. Combining all the margins provided by the OEM, R-Infra
has been able to load the unit
alleged that such Micro-Processors are products of Original Equipment
Manufacturers ('OEMs') i.e. Tray Micro-processors, which are different from Boxed
Micro ... Intel authorised distributors in India and falsely
claiming such products to be OEM products (i.e. Tray Micro-processor), is violative of
Section
petitioner that the fourth
respondent is the Original Equipment Manufacture (in short, “OEM”)
and the third respondent is its agent. The second respondent/Central
Vigilance ... agent on behalf of the
http://www.judis.nic.in
5
principal/OEM or the Principal/OEM can bid. Hence, the simultaneous
bids
amongst other things, an Agency Agreement with Foreign
Manufacturer/ Original Equipment Manufacturer (OEM) for specific
product. It also requires a participant to upload the Permanent ... manufacturers and vendors. It is as follows: -
"9.3 Registration of Foreign OEMs and Vendors
9.3.1 Procedure for Registration: At present foreign
OEMs and vendors
process. The petitioners subsequently provided the Original Equipment
Manufacturer (in short 'OEM') Certificate to the authorities. The financial bid of
the petitioners ... proceeded to negotiate with L-2 bidder without taking
into consideration the OEM certificate subsequently submitted by the petitioners.
In the event, the petitioners were