Mafatlal Engineering Industries Ltd. vs Mafatlal Engineering Industries ... on 14 December, 1990
Equivalent citations: (1992
affording parallel operation of captive generating units with TRANSCO's Grid.
2. By availing the facility of parallel operation, the consumer is enjoying ... parallel operation.
4. The A.P. TRANSCO proposes to levy the "Grid Support Charges" at the time of existing demand charge
grid support charges for parallel operation on
the basis of the data, materials and scientific inputs relating to
parallel operations. As pointed ... determined the Grid support charges/parallel
operation charges as shown below:
FY2022-23
Yearly Monthly
charges charge
s
Total installed capacity 16854
(MW)
DISCOM
being distribution licensee has been charging Cross Subsidy
Surcharges ('CSS'), Additional Surcharges ('ASC') and Parallel Operation
Charges
getting cross
subsidy surcharge which is higher than the parallel operation charges which was
being paid earlier. Once it is held that ... generating plant was not operating as a
captive generating plant then there was no liability to pay parallel operation charges.
16. Section 42 (2) deals
generating plant was not operating as a captive
generating plant then there was no liability to pay parallel
operation charges.
16. Section 42 (2) deals ... parallel operation charges, the State Commission has
correctly held that the charges which were paid earlier
as parallel operation charges have to be adjusted
coal washeries to the distribution
licensee and consequently the parallel
operation charges which were paid earlier by
the Aryan Plant to the distribution licensee
shall ... generating plant was not operating as a
captive generating plant then there was no liability to
pay parallel operation charges.
16. Section 42 (2) deals
Public Version vs Unknown on 21 April, 2025
Public Version
COMPETITION COMMISSION OF INDIA
Case
which he has been relieved from the post of Computer
Operator Gr.II PSSCIV/RIE, Bhopal to join at RIE Mysuru, in terms ... Specific Unit and there is no
parallel unit at RIE, Mysuru.
2.4 There is no post of Computer Operator Grade-II at RIE Mysuru
control vests in the seeker of the information who has only
to operate the statutorily prescribed mechanism to access the
information. It is not this ... public authority".
35. The mere prescription of a higher charge in the other statutory
mechanism (in this case Section 610 of the Companies