Rolls Ltd, challenging the levy
of Parallel Operation Charges (POC). The Parallel Operation Charges (POC)
had been charged by the appellants on the basis ... availed
the facility of parallel operation of the CPP. Moreover, the matter of
determination of parallel operation charge was sub-judice and
respondent
introducing the Parallel Operation
Charges for all the CPP Consumers in the State. However it is clarified
that levy of parallel operation charge is without ... Parallel Operation Charges
All CPP Consumers Rs.20/- per KVA per month
..."
11. There is no dispute over the fact that parallel operation charge
support method, the Commission is of the
view that the parallel operation charge has to be related to the fixed
costs of the utilities. According ... GERC is as
follows:-
"6.7. Hence, we decide that the parallel operation charge is
applicable to the petitioner and the petitioner is liable
predisposed state of mind and, hence, non est.
EARLIER DISCOURSE ON PARALLEL OPERATIONS CHARGE
14. In the matter of Chhattisgarh State Power Distribution Company
Limited ... legal position. Neither the Commission nor
the Board is estopped from charging parallel operation
charges simply because the Board expressed such an
opinion about
basis of the datas, materials
and scientific inputs relating to parallel operations.
d) In compliance to the aforesaid judgment of this Tribunal, the State
Commission ... pursuance of the provision of sub-rule (2) of
Rule 3, parallel operation charge shall not be leviable on them.
f) CSPDCL sought the review
this
order."
(y) that the pre condition for levy of Parallel Operation Charge is
the co-location of the Captive Power Plant and load ... different places there is no grid support and there is no
parallel operation.
(z) that the Appellant's Tawa plant is a CPP which
consist of a fixed
charge, demand charge and an energy charge or a
combination of these;
b. Connectivity charge, which shall be levied to meet ... connecting the customer to the licensee's
transmission system;
c. Parallel operation charge shall be levied for Captive Power
Plant if the plant
dated 21.12.1998 had accordingly included the rate of parallel operation charges.
Clause 19: "The parallel operation charges leviable at 7.5% of demand charges ... recover any amount by way of parallel operation charges. However, it insists that prior to 31.08.2000 the parallel operation charges recovered can be retained
Punjab State Electricity
Board, could recover was parallel operation charges from the
captive generating plants. Admittedly, such charge was being
recovered from the year ... legal position. Neither the
Commission nor the Board is estopped from charging parallel operation
charges simply because the Board expressed such an opinion about
liable to pay ACD (Advance Consumption Deposit/Security)
and also Parallel Operation Charge @ 200 per kVA of the
7-½% of the installed capacity ... Inspection Report on the levy/deposit of Advance
Consumption Deposit (ACD), parallel operation charge and
permission fees because these are as per the then prevailing