corner of the Greater
Chennai Corporation area and the surplus water from Paruthipattu,
Ayapakkam, Attheri and Arabatheri Lakes reaches the Ambattur Lake
during monsoon season
desilting has been completed for 4,000 m from
Vanagaram bridge to Paruthipattu and execution of canal has been
completed ... length of 530 m. Presently, column raising
work is under progress from Paruthipattu bridge to Kaduvetti causeways
on both sides of the river
City Municipal
Corporation in Thiruvallur district through Public Works
Department.
10
iii) Paruthipattu Lake in Avadi City Municipal Corporation
in Thiruvallur district through
CRRT had inspected the
outfalls into the River Cooum from Paruthipattu to its mouth and
identified 81 numbers of additional outfalls carrying sewage, of which
purview of CRRT, since
the restoration activities are being undertaken only from
Paruthipattu to river mouth and informed the Municipality to
adhere to the discharging
canal to Vilinjiyambakkam and the surplus water
from this lake goes to Paruthipattu Lake and these lakes
are linked and rain water is stored. However
CRRT, inspected the
outfalls into River cooum from Paruthipattu to its mouth and identified 81
nos of additional outfalls carrying sewage, of which
CRRT inspected the
outfalls into River Coovum from Paruthipattu to its mouth and
identified 61 nos of additional outfalls carrying sewage within
Chennai city
desilting has been completed for 4,000 m from
Vanagaram bridge to Paruthipattu and execution of canal has been
completed ... length of 530 m. Presently, column raising
work is under progress from Paruthipattu bridge to Kaduvetti causeways
on both sides of the river
Vilinjiyambakkam and the surplus water from this lake
2
goes to Paruthipattu Lake and these lakes are linked and
rain water is stored