condition as regards the
shifting of the premises to the permanent building as stipulated ... formal request for change
from the rented premises to their own permanent building.
5. In the year 2014, the NCTE came out with the National
putting up permanent structures for the college, the
member of the legislative assembly has offered to construct a
semi-permanent building at the site covered ... order, the Government accorded administrative sanction
for construction of a semi-permanent building at the said site at
a cost of Rs.1.50 crores
para
7(d) of Appendix 7, pending construction of permanent building, the
institution can be run in suitable temporary premises up to a maximum
period ... will also be considered
valid for the purpose. Pending construction of permanent
building in the above land, the institution may provide these
facilities in suitable
building and the
repair effected has only added the value and utility of the building and has also
increased the look of the building ... building in such a manner as to
destroy or reduce the value or utility of the building materially
and permanently. We set aside the order
Vardhaman Publishers Limited, ... vs Mathrubhumi Printing And Publishing ... on 27 August, 1990
Equivalent citations: [1991
building have only strengthened the building, which
would not result in destruction or reduction of the value
or utility of the building materially and permanently ... strengthening' of the
building will tend to reduce the value or utility of the
building materially and permanently. In this case
cents of land to enable him to construct a semi
permanent building for conducting the business whereby the plaint
A schedule property was leased ... semi permanent building by spending Rs.20,000/- in plaint A
schedule property which was shown plaint B schedule and he
obtained
define the expression
permanent tenancy. According to us permanent tenancy means a
tenancy in perpetuity. The claim of permanent tenancy,
therefore, means the claim ... building to
the respondent and failing such conveyance, to allow the tenant
RCR. N0. 209/03
-10-
to hold the building permanently. But as rightly
building after constructing a tube well and a latrine
would definitely reduce the value or utility of the building materially and
permanently. It is stated ... building in such a
manner as to destroy or reduce the value or utility of the building materially
and permanently." The order of eviction
building permit regarding construction of retaining wall, the
petitioner was attempting to make further construction over the
petitioner's building bearing temporary building number ... 2019 : 13:
building number assigned to the petitioner's building as 2/482A was
changed and the Panchayat had assigned permanent building number