Hospital at
Amalapuram. On
20.8.1999 with the assistance of anaesthetist he conducted the operation by applying
plaster of paris to the leg. The mandible
parties the Forum below, appointed Local
Commissioner, Assistant Engineer, HP PWD, Sub Division Ghumarwin, who reported
that plastering work has been completed by the respondent
stable and the bones could not be
adjusted immediately a temporary plaster was put on the right hand
after giving some medicines.
It
has further ... again cleaned and
bones were adjusted accordingly with assistance of Anesthetic. The
temporary plaster was put on the right hand. The patient was further
examined
opposite
party no.1/Dr.Chinoy with the help of his assistants, as a corrective measure.
Complex Tibial reconstruction procedure was done (Debridement with ... cutter was not working. Therefore,
opposite party no.1s Assistant- Dr.Bhushan cut his plaster and removed the
steel pins which came
would obviate the need for a plaster cast.
Even on this date the complainants leg was in plaster. Dr. Maini advised admission and asked ... complainant to takea date from the concerned assistant. Dr. Maini does not personally give dates of
admission as alleged by the complainant.
The complainant, however
Chakravarthy claiming to be assistant of the opponent no.2
i.e.Dr.Dholakia visited the complainant who removed plaster from the knee
joint
purchased open plot
and also requested the opposite party to assist him in purchasing
construction material and procuring labour.
6. It is stated that ... They have supervised and assisted
the complainant till the completion of civil work of the building
except the outer plastering, as they were busy
alleged not to have been carried out. Cracks to the
plaster/dampness in external walls was not to considered as defective work
unless the architect ... issuing the
commencement certificate or occupation certificate, etc. The developer was to assist
the complainants in forming a Co-operative Society a Limited, Company
thereafter was treated at Fortis Hospital where his two fingers were
strapped/plastered for three weeks and he was advised physiotherapy thereafter. On account ... became infructuous. The respondent No.1 could not assist the
committee on 19-09-2005 and also had to cancel his visit to Mumbai where
plastering as 460 M2. The demolishing costs of the damaged plastering is mentioned as at the rate of Rs. 50/ M2 ie Rs. 2300/-. Plastering ... examined as PW2 and was cross examined.
7. The report of the Assistant Engineer of PWD who was appointed by the Forum as Commissioner