Search Results Page

Search Results

1 - 10 of 5911 (1.21 seconds)

National High Speed Rail Corporation ... vs Montecarlo Limited on 31 January, 2022

implementation of the Project; (5) Bidding Documents, including Prequalification Documents (hereinafter referred to as “Bidding Documents”); (6) General Arrangements Drawings (hereinafter referred ... those prepared under the Follow-up study), Basic Design Documents, Standard Design Documents, Detailed Design Documents (along with Design Basis Reports (set of conditions
Supreme Court of India Cites 25 - Cited by 91 - M R Shah - Full Document

Page No.# 1/43 vs Assam Electricity Grid Corporation Ltd ... on 12 August, 2022

Procurement; (v) Contract management; (vi) Design Review; (vii) Project Scheduling and Monitoring; (viii) Supervision of Project Implementation; (ix) Prepare E&S documents and Monitor ... procurement process from strategic planning to the award and management of contracts and that the said Recipient shall retain all procurement documentation and records
Gauhati High Court Cites 36 - Cited by 0 - M R Pathak - Full Document
1   2 3 4 5 6 7 8 9 10 Next