such as, un-interrupted power supply (UPS) system, pollution control equipment, quality assurance equipment, storage systems, special racks for storage, modular furniture, computer furniture, anti
Engineering Design,
Construction works of Intake Structure, Box culvert including Pre - Support System
for Deep Excavation & Allied Works and Construction of Tunnel for 584m ... Percentage of work completed 88.50 %
Remaining works
Intake Transition concreting Trash Rack erection, Gate Erection,
Maintenance slab concreting, pile cutting at the side of River
Engineering
Design, Construction works of Intake Structure, Box culvert
including Pre-Support System for Deep Excavation & Allied Works
and Construction of Tunnel for 584M ... Percentage of work 75%
completed
Remaining works
Intake structure Transition concereting Trash Rack erection, Gate
Erection, Maintenance slab concreting, pile
cutting at the side
Tata Communications Ltd vs Telecom Regulatory Authority Of India on 11 November, 2016
Author: S
Tata Communications Ltd vs Telecom Regulatory Authority Of India on 11 November, 2016
Author: S
S.Gopi Krishnan vs The Director on 26 July, 2019
Author: S.Manikumar
Bench: S
A.Radhakrishnan vs The Secretary on 29 July, 2019
Bench: S.Manikumar , Subramonium Prasad
W
S.Siva Shankar vs The Home Secretary on 29 July, 2019
Bench: S.Manikumar , Subramonium
Engineering Design, Construction works of Intake
Structure, Box culvert including Pre-Support System for
Deep Excavation & Allied Works and Construction of
Tunnel for 584M ... Percentage of 75%
work completed
Remaining works
Intake structure Transition concereting Trash Rack erection, Gate
Erection, Maintenance slab concreting, pile cutting at the
side