deliberation, decided to put up
new bridges in the place of collapsed bridge and also reconstruct
the super passage bridge. It is further stated, majority ... 16237/12 7
reconstructed. Instead of reconstruction or renovation of the
second bridge, if a new bridge is put up connecting Devi Temple
road
regarding the condition of the bridge and the said
authorities/appellants assured him that the said bridge will be
reconstructed/repaired before the plaintiff could ... complete the work up to bridge only. In spite of his repeated
requests, the bridge was neither reconstructed nor repaired and so it was
impossible
Government Institutions (EW),
Thiruvananthapuram, respondents 1 to 4, to immediately reconstruct
Venthodampadi - Muthanthandu bridge, in a time bound manner,
within a period fixed by this ... averments, documents, the need of the people to
have a bridge reconstructed, for connecting two Panchayats as stated
supra, we are also of the view
before this Court
seeking for a positive direction to have the Bridge reconstructed
and widened.
4. The first respondent has filed a statement dated ... representation preferred by the petitioner,
referring to the necessity to reconstruct the bridge.
8. The 4th respondent has filed an additional statement
dated 02.02.2013 stating
Roads &
Bridges)."
Out of 258 damaged bridges, 136 bridges have
been repaired and made available for traffic. At 21 locations,
reconstruction of bridges ... reconstructed. Ten bridges
were under construction, 16 bridges were under tender
process and the rest 49 bridges are proposed to be
reconstructed under World Bank
According to the learned Senior Counsel, in case of widening
and reconstruction of bridge across Mithi river at Dharavi near
Drive-in-theatre ... this order.
Respondent no.3 is concerned with the reconstruction of
Hancock Bridge and construction of Vehicular Bridge of Yari
Road. The tender notice
river Thirumanimutharu near Paramathi Velur. The actual cost of reconstruction of the bridge and the improvement to approaches was 117.36 lakhs. The cost ... lakhs was the actual cost of reconstruction of the Bridge, improvements to approaches and the interest at 9%. It is further stated that the Government
vehicles passing over any bridge or through any tunnel including any approach road thereto (being a bridge or tunnel constructed, reconstructed or repaired after ... toll in respect of a bridge or a tunnel. Firstly, the bridge or the tunnel must have been constructed, reconstructed or repaired after the coming
Arches below Mahalaxmi Bridge on the gorund or reconstruction of Mahalaxmi Bridge, but really they were not covered by the reconstruction of Mahalaxmi Bridge ... that they were required to be evicted because of the reconstruction of Mahalaxmi Bridge. However, since they were not under the Mahalaxmi Bridge the enquiries
added to the cost of the original bridge then the bridge in question would be a permanent bridge.
13. The question that falls for consideration ... bridge in use. We are therefore of the opinion that the bridge which has been strengthened/rehabilitated is a new bridge for all intends