history of the premises and the
circumstances leading to the regularization of the unauthorised
construction. A perusal of this file disproves the charge that ... would have come into
operation. Therefore, the allegation of regularizing the unauthorised
construction is ex facie incorrect. Therefore, apart from incorrect
presumptions made
history of the premises and the
circumstances leading to the regularization of the unauthorised
construction. A perusal of this file disproves the charge that ... would have come into
operation. Therefore, the allegation of regularizing the unauthorised
construction is ex facie incorrect. Therefore, apart from incorrect
presumptions made
history of the premises and the
circumstances leading to the regularization of the unauthorised
construction. A perusal of this file disproves the charge that ... would have come into
operation. Therefore, the allegation of regularizing the unauthorised
construction is ex facie incorrect. Therefore, apart from incorrect
presumptions made
awarded contract by the respondent (Delhi Development Authority) for construction of unauthorised regularized colony of Brahampura Complex SH Drains, Culverts, Roads and Paths
being construction on 23.11.1982 by the Zonal Engineer (B). Thus, the unauthorised construction continued from 16.10.1982 to 23.11.1982 but he failed to launch regular prosecutions ... being construction on 23.11.1982 by the Zonal Engineer (B). Thus, the unauthorised construction continued from 16.10.1982 to 23.11.1982 but he failed to launch regular prosecutions
unauthorised construction and removal of
misuse in the properties in time-bound
manner by the Committee. Otherwise the
action of removal of unauthorised
construction ... taken on regular basis as
per the policy of the Corporation.
Removal of unauthorised construction is a
routine duty, which MCD is performing. A
weekly
Needless to mention here, the unauthorised construction at the aforementtioned premises have also been demolished.Besides, the regular demolitions actions are being taken ... programme fixed by the Department from the time to time. No unauthorised construction activity has either been allowed or permitted during my tenure
which parts of the building are unauthorised or
in misuse and whether such unauthorised
construction/misuse can be regularized/condoned and
if so on what
reveals that the complaints
in question made regarding the unauthorised construction in the property in
question could not be proved on record as the said ... evidence of Superintendent Engineer of MCD (PW-5) that
unauthorised construction can be regularized even subsequently, after
following the due procedure and on payment
which parts of
the building are unauthorised or in misuse and whether such
unauthorised construction/misuse can be regularized/condoned
and if so on what ... 2002 Page 21 of 23
flats/spaces having unauthorised construction or the misuse, of
the same and to thereafter take action in accordance with