streets into which the building or sites to be drained; (i) method of disposal of waste water, sewerage and storm water; and (j) position ... Plan.
(a) The building plan or plans shall be drawn to a scale not less than that given below : (i) 1 : 50 for plots upto
The Punjab Scheduled Roads and Controlled Areas Restriction of Unregulated Development Rules, 1965
HARYANA
India
admission subsidy amount sufficient for his maintenance or diet according to scale, and taught some trade provided in the Settlement. (3) The Special Officer ... under private contractors. 43. Method of payment.
- In all Settlements, the inmates will be paid wages, according to the scale fixed by Government from time
disadvantage. 4. [ Method of Recruitment and conditions of service. [Substituted vide Haryana Act No. 9 of 1992.]
- The method of recruitment, and the conditions ... such code of conduct as may be prescribed].. 6. Salary.
- The scales of pay and other allowances and privileges of the employees shall be such
The Municipal Account Code, 1930
HARYANA
India
The Municipal Account Code, 1930
Rule THE-MUNICIPAL
detailed specifications
Collectors
Precipitators
Scrubbers
(1)
(2)
(3)
(4)
10. Proposed method of handling and disposal of waste trapped by pollution arresting equipment/Hazardous Waste ... following documents in triplicate: 1. A survey of the land on the scale 1 inch to 40 feet showing the existing means of access
streets into which the building or site is to be drained; (i) method of disposal of waste water, sewerage and storm water; and (j) position ... building plan or plans shall be drawn to a scale not less than given below :- (i) 1:50 for plots up to 1000 square metres
street to the building which the applicant intends to build; (i) method of disposal of waste water, sewerage and storm water ; and (j) position ... Building plan.
(1) The building plan or plans shall be drawn to scale of not less than:- (a) 1 : 50 for plots upto
street into which the building or site is to be drained. (ix) method of disposal of waste water, sewage and storm water. 7. Building plan ... Section 4(2)(a)].
- The building plan shall be drawn to a scale of not less than 1 centimetre to one meter (1 inch
service.
- The member of the Service shall be entitled to such scales of pay including special, if any, and other allowances as may be authorised ... scales of pay at present in force in respect of various posts are given in Appendix A to these rules. 10. Method of recruitment.
- Recruitment