further
construction on the said suit schedule property without leaving
the setback area and mandatory injunction to demolish the
construction which is already ... without leaving the
setback area, and for costs and such other reliefs.
2. It is averred in the plaint that, the plaintiff is the
absolute
construction in the portion behind
his existing house and within the setback area
abutting their property. He has excavated the ground
to lay foundation within ... setback area and on
encroaching upon the area of their land, which they
have left for passage of drainage water and the
foundation
violation of the sanctioned plan including the
staircase in the setback area on the eastern side
abutting this defendant's property. The defendant
craves ... plaintiff had to put
up a mesh over his setback area of about 3 feet
adjoining the compound wall separating both
premises to prevent
belonging to all the
occupants of the building as being a setback area as
shown in the sanctioned plan. There is no cause of action ... belonging to all the occupants of the
building as being a setback area as shown in the
sanctioned plan. As such, the plaintiff
respondent 2 to
demolish illegal construction made in the basement and
setback area as per notice dated 19.06.2012 and 17.07.2012.
vi. Issue a writ
respondent after the notification of the Comprehensive Development Plan
for Puducherry Planning Area – 2036 and also exceeds the compoundable
limit of 10% prescribed ... applied, since already been issued a Gazette saying that
the setback area should not be consider within the boulevard limit that is of
petitioner
with revised plan requesting to grant exemption only with
respect to setback area. However, by the impugned order dated 11.06.2018,
the petitioner's representation
back, rear
setback and side setback as available to the subject
construction has been provided. More specifically the
front setback is available to the subject ... establishes and confirms
the availability of necessary front, side and rear setback
areas to the subject construction as well as the availability
of proper access
back, rear
setback and side setback as available to the subject
construction has been provided. More specifically the
front setback is available to the subject ... establishes and confirms
the availability of necessary front, side and rear setback
areas to the subject construction as well as the availability
of proper access
details of the front set back, rear
setback and side setback as available to the subject
construction has been provided. More specifically the
front ... establishes and confirms
the availability of necessary front, side and rear setback
areas to the subject construction as well as the availability
of proper access