length. It conducted the water of the river without a head sluice down an old channel on the north bank called Vadagaran" which irrigated ... water to pass below the dam at ordinary seasons was the sand sluice which will be referred to late. The mere raising of such
obscurity. Each channel derived its water by means of weirs and sluices from the River Vamsadhara and the water was distributed throughout the district ... district, including those contiguous to the River Vamsadhara, together with the head sluices of the four channels, and, if the principles of English law governing
tank, "Gadi Vagu" would empty itself through two wide sluices. Because of these breaches water could not be trapped ... liberty to let out water in tank bed area through sluices marked A and B in the plan attached to the plaint, which
claimed on account of water reservoir and sluice
gate constructed thereon, which was in addition to a
claim of compensation ... Land
Acquisition Officer, Hoshangabad, praying therein
that compensation for water reservoir and sluice
gate installed thereon should be payable
goods in Lot No. 32 comprised of 1540 pieces of "value sluice water flanged and drilled ... condition of the goods. P.W. 3 further stated that five sluice valves were set apart for sale to Benaras Hindu University which
valves submitted by
agency M/sPAVCO Engineering in time, particularly those of sluices
valves, which delayed the completion of work.
RFA (OS) No.48/2015 ... considered and therefore the defendant at its own had arranged
the said sluice valve on 1.3.07. It may be noted that the Plaintiff
in this
channel, a short distance from the river, there is a head sluice situate in the mitta. Further on also within the boundaries of the mitta ... Periakulam tank; and in times of low supply through a madai or sluice called Pulavadaimadai at the western end of the Periakulam tank
higher up than the two suit villages, there had been a sluice C and a channel CG, known as the Attur channel, which, after passing ... mouth of the river and three or four miles above the sluice C of the Attur channel, with north and south main channels taking
factory did not come under the head "Hydraulic works, pipelines and sluices" as described under item III(ii)A(1) of Appendix ... that the machinery came under the head "Hydraulic works, pipelines and sluices" for which no extra shift allowance was admissible.
3. Assessee appealed
alleged is of three kinds: firstly, improper and inadequate construction of the sluice gate known as the Macca dam ; secondly, defendant's refusal ... failure to keep the ditch cleared from obstruction and the sluice ga|te in proper working order.
3. Now, the first of these allegations