Nabha Power Limited vs Punjab State Power Corporation Ltd on 17 May, 2018
Appeal No
perform its statutory function
of specifying the Grid Code having regard to Grid
Standards.
(i) In O.P. No.1 of 2012 (BSES Rajdhani Power ... states that
the Central Commission shall specify Grid Code having
regard to Grid Standards. Thus, it is one of the statutory
functions of the Central
comply with, interalia, the Grid Code and Grid
connectivity Standards. Supply Code, which is meant
for consumers of the distribution licensee, has not
application ... provision of Supply Code, is not convincing. The State
grid code deals with the matters related to technical
standards, metering, operation, protection, safety co-
ordination
reliance on Regulation 30 (i) of the
Delhi Electricity Supply Code & Performance Standards
Regulations, hereinafter referred to as Supply Code/Regulations
which runs ... clarified that Clause 30(i) of
the Delhi Electricity Supply Code & Performance
Standards Regulations, 2007 notified on 18.4.2007,
stipulates that for area developed
follow the
procedure specified in the Commission's Electricity
Supply Code and Standards of Performance
Regulations. Under Regulation 4 .2 of the DOA
Regulations ... consumer and is governed by the
relevant provisions of the Supply Code and
Standards of Performance Regulations"
38. Even Regulation
M/S. Greenyana Solar Private Limited vs Haryana Electricity Regulatory ... on 20 September, 2021
IN
specified in the Performance
Test Code -4 (PTC-4) and Performance Test
Code-6 (PTC-6) of ASME standards for boilers
and turbines respectively ... specified in the Performance Testing Code - 4 (PTC
- 4) and Performance Test Code - 6 (PTC - 6) of ASME
Standards for boilers and turbines respectively
comply with, interalia, the Grid Code and Grid
connectivity Standards. Supply Code, which is meant
for consumers of the distribution licensee, has not
application ... provision of Supply Code, is not convincing. The State
grid code deals with the matters related to technical
standards, metering, operation, protection, safety co-
ordination
Power Producer/Developer shall
provide protection system in compliance to Grid Code
requirement for short circuit level, neutral grounding,
Page 13 of 26
current unbalance ... Producer/Developer shall comply
with the Grid Code, Load Despatch & System Operation
Code, Metering Code, Performance Standards,
Protection Code and Safety Code
process of revision of Delhi
Electricity Supply Code and Performance Standard
Regulation, 2007 and will examine the issue of interest
rate on Security Deposit ... Bank Guarantee, while finalizing the
revised Delhi Electricity Supply Code and Performance
Standards Regulations....."
Page 16 of 20
APPEAL