Chhatisgarh State Power Transmission ... vs M/S R R Energy Ltd. & Ors on 24 May, 2011

comply with, interalia, the Grid Code and Grid connectivity Standards. Supply Code, which is meant for consumers of the distribution licensee, has not application ... provision of Supply Code, is not convincing. The State grid code deals with the matters related to technical standards, metering, operation, protection, safety co- ordination
Appellate Tribunal For Electricity Cites 15 - Cited by 1 - Full Document

Chhatisgarh State Power Transmission ... vs M/S R R Energy Ltd. & Ors on 24 May, 2011

comply with, interalia, the Grid Code and Grid connectivity Standards. Supply Code, which is meant for consumers of the distribution licensee, has not application ... provision of Supply Code, is not convincing. The State grid code deals with the matters related to technical standards, metering, operation, protection, safety co- ordination
Appellate Tribunal For Electricity Cites 15 - Cited by 0 - Full Document

Kishangarh Hi-Tech Textile Park Ltd ... vs Rajasthan Electricity Regulatory ... on 17 December, 2019

Power Producer/Developer shall provide protection system in compliance to Grid Code requirement for short circuit level, neutral grounding, Page 13 of 26 current unbalance ... Producer/Developer shall comply with the Grid Code, Load Despatch & System Operation Code, Metering Code, Performance Standards, Protection Code and Safety Code
Appellate Tribunal For Electricity Cites 10 - Cited by 0 - Full Document