examination and hydrostatic test or hydrostatic stretch test. (b) If deleterious structural changes in the material due to the action of heat of the fire
apply to the committee for necessary permission and if no structural changes are involved and the proposed repairs are not likely to cause any defect
structural change such as an addition to the area or height, or the removal of part of building, or any change to the structure such ... court yard at the ground level, garden, rocky area, well and well structures, plant, nursery, water pool, swimming pool (if uncovered) platform around a tree
structural change such as an addition to the area or height, or the removal of part of building, or any change to the structure such ... court yard at the ground level, garden, rocky area, well and well structures, plant, nursery, water pool, swimming pool (if uncovered) platform around a tree
examination and hydrostatic test or hydrostatic stretch test. (b) If deleterious structural changes in the material due to the action of heat of the fire
change in the record-of-rights. (4) Such change in the record-of-rights shall be informed by the person in whose favour the change ... rule 5 ] Application for permission to construct pucca structure/building or to change the nature, character and dimension of a structure, on the land comprised
The Foreign Exchange Management (Transfer or Issue of any Foreign Security) Regulations, 2004
UNION OF
The U.P. Electricity Regulatory Commission (Conduct of Business) Regulations, 2004
UTTAR PRADESH
India
The
Controller for making. any pucca construction or changing the nature, character and dimension of an existing structure on the land, shall be in Form ... mutatis mutandis be followed in case of changing the nature, character and dimension of any existing structure on land comprised in thika tenancy
proposed scheme for reduction in losses and improvement in efficiencies, changes in the tariff structure for any specific category of consumer; and (e) Such other