Nayan
Dholakia Structural Engineer (Chartered Engineer) (For
Tenants) to justify their statement that structural
6
9.ao.377-21.doc
repairs on urgent basis with ... repairs by
partially vacating the dangerous part of
structure.
C-2B Structures requiring Major structural
repairs without vacating the structure.
C-3 Minor repairs
Structural
Stability Certifcate"). The Structural Stability Certifcate
issued by such Structural Engineer shall be submitted to the
Commissioner.
(2) The Structural Stability Certifcate shall ... failure to carry out the repairs which
are styled as corrective repairs and recommended by the
Structural Engineer, which repairs have to be carried
Structural
Stability Certifcate"). The Structural Stability Certifcate
issued by such Structural Engineer shall be submitted to the
Commissioner.
(2) The Structural Stability Certifcate shall ... failure to carry out the repairs which
are styled as corrective repairs and recommended by the
Structural Engineer, which repairs have to be carried
order directing Respondent Nos.2 to 4 to
carry out the structural repair to the building since the excess amount
towards Structural Repair is demanded ... Board Authority
have been paid by Petitioners to carry out Structural Repair of the
building being Kalyan Bhavan, property Cess
Report conducted by EN Lab Services,
registered structural engineer, (d) structural audit report by Mr. Milind
Patil, structural engineer having B.M.C. License ... brushed aside the opinion of the experts/structural engineers
favoring that the subject structure could be repaired and need not be
demolished. The guidelines, framed
Report conducted by EN Lab Services,
registered structural engineer, (d) structural audit report by Mr. Milind
Patil, structural engineer having B.M.C. License ... brushed aside the opinion of the experts/structural engineers
favoring that the subject structure could be repaired and need not be
demolished. The guidelines, framed
Zone, had only been repaired/
renovated/ reconstructed without exceeding the plinth area, and
such repair and reconstruction of existing structure was
permissible within ... structures was being increased to
2537.22 sq. metres. It is the Petitioners' case that even the existing structures,
which were purportedly being repaired/altered
burdened the plaintiff with the duty to carry out
all necessary structural repairs in an expeditious manner but the
suit premises was handed over ... duty of the plaintiff company to carry out the necessary
structural repairs in an expeditious manner. He also admitted
that it was the duty
structural repairs" for the purposes of Chapter VIII means repairs or replacement of decayed, cracked, or out of plumb structural components of a building ... structural repairs" includes repairs and replacement of all items which are required to be repaired or replaced as a consequence of the repairs or replacement
observed that the repairs in question could not be called "current repairs" but that the assessee had undertaken major structural repairs which ... contended on behalf of the department that the repairs were major repairs which increased the structural strength as well as life of the building