observations read thus :-
"The structures are repairable but requires urgent structural
repairs ... water-proofing and other civil repairs to maintain
structural stability. Urgent and extensive structure requires
structural repairs, including polymer modified mortar,
jacketing, recasting, micro-concreting
this case the
structure is not at all dangerous or unsafe for human habitation.
The structure is capable of being repaired. If repairs are carried ... report of the Structural Engineer engaged by the
Petitioners. It categorized the structure as "C2-B". However, that
Structural Engineer has not carried
certain essential on-goings or imminent
works like improvements, strengthening, widening, structural
repairs, maintenance, management, operation, reasonable
returns and also interest on the capital outlay ... certain essential
ongoings or imminent works like improvements,
strengthening, widening structural repairs,
maintenance and also interest on such outlay was
specifically rejected by this Court
oswpl-15116-2023.doc
demolished requiring major structural repairs. A time
period of seven months was indicated for undertaking
structural repairs. A third notice under ... earlier structural audit
reports categorizing the buildings of the society as C2-
A requiring evacuation and/or partial demolition with
major structural repairs in terms
structure or building to its
pre-existing structure, having the same horizontal and vertical limit,
that is, if the structure is re-constructed with same ... defines "repair and renovation" as under:-
"(m) "repair and renovation" means alterations to a pre-
existing structure or building
duties and functions would be, (a) to undertake and carry out structural repairs to buildings in respect of which the impugned tax is levied ... levied and which are beyond repairs or buildings in which structural repairs have once been carried out but further repairs are not possible
repair and renovation of House
No.439 has been directly granted. In addition to above, the permission was
granted to repair the wooden structure ... restriction of whatsoever nature on the user of the structure, post
repairs or reconstruction. The subject property falls in CRZ-III and the
restriction
observed that the repairs in question could not be
called "current repairs" but that the assessee had undertaken major structural
repairs which ... into
existence. The repairs also could not be regarded as heavy structural repairs, for,
according to the assessee's architects, what could
2005-06/5426 dated 23.9.05,
nature of work is structural repair works for building and technological
structures including roof sheeting and side cladding works ... buildings and technological structures which are neither goods nor
equipment but industrial structures/ buildings. Hence, the structural
repair work for building and Technological structures including
2005-06/5426 dated 23.9.05,
nature of work is structural repair works for building and technological
structures including roof sheeting and side cladding works ... buildings and technological structures which are neither goods nor
equipment but industrial structures/ buildings. Hence, the structural
repair work for building and Technological structures including