conduct a structural audit of
the entire structure referred to above, from the ground upto the roof to
ascertain its structural stability and also ... cost of the
structural audit as well as the repair of the entire structure.
7. Accordingly, NDMC is directed to place on record the list
carried out by respondent no. 5 and 6, can be repaired so that
the structural integrity is restored.
3. Learned counsel appearing for respondent ... suggest ways and means of repairing property no. 2924 to restore
its structural integrity.
5. On such a report being given, respondent
conduct a structural audit of
the entire structure referred to above, from the ground upto the roof to
ascertain its structural stability and also ... cost of the
structural audit as well as the repair of the entire structure.
7. Accordingly, NDMC is directed to place on record the list
conduct a structural audit of
the entire structure referred to above, from the ground upto the roof to
ascertain its structural stability and also ... cost of the
structural audit as well as the repair of the entire structure.
7. Accordingly, NDMC is directed to place on record the list
conduct a structural audit of
the entire structure referred to above, from the ground upto the roof to
ascertain its structural stability and also ... cost of the
structural audit as well as the repair of the entire structure.
7. Accordingly, NDMC is directed to place on record the list
conduct a structural audit of
the entire structure referred to above, from the ground upto the roof to
ascertain its structural stability and also ... cost of the
structural audit as well as the repair of the entire structure.
7. Accordingly, NDMC is directed to place on record the list
placed on record the
photographs of the existing structure as well as the nature of repair
work that is required to be carried ... respondent Corporation shall also take photographs of the existing
structure. Thereafter the repair work shall be monitored by the said
officer by a weekly visit
Petitioner seeks a direction to the respondent to grant
permission for repair/renovation work in property bearing No.H-34,
W-10C/18, Western ... plan of the existing structure along with photographs
of the existing structure as well as the details of the proposed
repair/renovation work that
petitioner is not carrying out any structural
additions and alterations but is only carrying out repair and renovation
work to the premises, which has recently
email of the Court Master an
affidavit enlisting the details of repair work which the appellant
intends to carry out. The same is taken ... apprehension that in the garb of alleged repair work, appellant
may carry out structural additions or alterations to the property or may
create third party