repairs on the structure. It has finally been
suggested by the Structural Engineer that only after completion of the
structural repairs, restoration and retrofitting works ... repaired on the basis of the
structural audit report, if feasible.
Post completion of the structural repairs, restoration &
retrofitting works including strengthening
repairs on the structure. It has finally been
suggested by the Structural Engineer that only after completion of the
structural repairs, restoration and retrofitting works ... repaired on the basis of the
structural audit report, if feasible.
Post completion of the structural repairs, restoration &
retrofitting works including strengthening
considering
deteriorated condition of these structural elements, it is necessary to
carry out the major structural repairs/rehabilitation/strengthening of
few structural elements immediately ... structural strengthening and retrofitting
technique by identifying the deficiency in the structural members
due to deteriorated condition of the structural elements. After
structural repair stability
building. That, as per
the structural audit report, the building is classified in C-2B
category requiring major structural repairs. That, on account
Page ... tenants should be exposed to danger while
residing in structure requiring major structural repairs during
resolution of disputes between the co-owners regarding their
shares
building. That, as per
the structural audit report, the building is classified in C-2B
category requiring major structural repairs. That, on account
Page ... tenants should be exposed to danger while
residing in structure requiring major structural repairs during
resolution of disputes between the co-owners regarding their
shares
building. That, as per
the structural audit report, the building is classified in C-2B
category requiring major structural repairs. That, on account
Page ... tenants should be exposed to danger while
residing in structure requiring major structural repairs during
resolution of disputes between the co-owners regarding their
shares
those that are partly unsafe.
Category C-2B buildings require major structural repairs without
vacating the structure. Category C-3 buildings require only minor
repairs ... structure or any other structure or place
in the neighbourhood thereof, the Commissioner may,
by written notice, require the owner or occupier of such
structure
clearly
suggests that they have no intention of carrying out the structural
repairs. Learned senior counsel would submit that it is only pursuant to
this ... structural repairs would typically require the permission of the municipal
corporation which the Respondents have neither considered nor have
made and that would further delay
those that are partly unsafe.
Category C-2B buildings require major structural repairs without
vacating the structure. Category C-3 buildings require only minor
repairs ... structure or any other structure or place
in the neighbourhood thereof, the Commissioner may,
by written notice, require the owner or occupier of such
structure
oswpl-15116-2023.doc
demolished requiring major structural repairs. A time
period of seven months was indicated for undertaking
structural repairs. A third notice under ... earlier structural audit
reports categorizing the buildings of the society as C2-
A requiring evacuation and/or partial demolition with
major structural repairs in terms