impact on
Godavari River. There is no proposal to install Fuel Gas Desulphurization
(FGD).
Proceedings before the Tribunal and stand of the respondents ... high efficiency ESPs, Flue gas
desulphurization system and Selective Catalyst Reduction units at
an additional cost even for super-critical units also commissioned
post
building in question, which is
proposed to be converted into Multi Super Specialty Hospital has been designed and
constructed for an imposed (Live) load ... building in question can be used
for the proposed Multi Super Specialty Hospital also with minor alterations which are
feasible in the light of latest
plan (LUDCP), the
major portion of the units of the M/s Super Smelters' Limited of
Jamuria Industrial area is over the light ... gas
plant over an area of 99.67 acres at Mouza-Mandalpur, JL no-37.
11
Furthermore, considerable payment has been made by M/s Super
super heat & reheat is > 5950 C. There are various air pollution
control mechanism provided such as installing Electrostatic Precipitators
(ESP), Flue Gas
handling area including coal stock yard.
Page 3 of 27
vii. Flue Gas Desulphurization (FGD) is under implementation, to be
commissioned on or before December ... Effluent Treatment system and Disposal:
.i Mis. Simhadri Super Thermal Power Project, NTPC Limited consumes 4,29,240
KLD of Sea water as make
S. Pugazhendhi vs Tamil Nadu State Pollution Control ... on 22 December, 2021
Bench: K Ramakrishnan
S. Pugazhendhi vs Tamil Nadu State Pollution Control ... on 5 March, 2021
Author: K. Ramakrishnan
cellulose Guidelines,
content, not Technical
those that Guide 2
have super Capacity
absorbent should be
polymers ~200
(SAP) Napkins/Day
Comprises of
two chambers ... effectiveness.
The
incineration
chamber shall
be designed to
4
include an
auxiliary gas
or oil burner to
be used as
necessary to
maintain the
prescribed
Anupam Raghav vs Union Of India on 18 January, 2022
Author: Adarsh Kumar Goel
Bench
Devidas Khatri vs Union Of India on 25 February, 2022
Author: Adarsh Kumar Goel
Bench