Road Tar and the residue product remaining after the distillation of Tar.
4. The fact that coal tar pitch is distinct from coal tar ... effect that tar oils are readded to tar to produce reconstituted tars whereas the noticee have themselves admitted that when tar is heated most
dated 22-4-1982 because
the notification covered tar
but not partially distiled tar.
2. Road Tar 3 The sample has the charac- Provisionally approved ... tar and tar preparation, which includes coal tar, pitch and preparation of pitch.
31. The appellants' submissions that their products are derivates of tar
Company. So far,
5Tonnes of shredded plastic had been used in road tarring works by KMC itself. Moreover, in
the bailing unit plastic bottles ... Shredded Plastic 15T(given to various Panchayats and
Municipalities for road tarring works)
Rejects and Leather Waste 27T
Dumped Legacy Waste 263T
TOTAL 331 Tonnes
Starting point of tar
road
E74'03'09.71"
2 2 2 N15'10'17.42" Tar road continuation ... Tar road
continuation(turn)
E74'03'02.98"
4 4 4 N15'10'22.04" Tar road
continuation
Company. So far, 5Tonnes
of shredded plastic had been used in road tarring works by KMC itself.
Moreover, in the bailing unit plastic bottles ... Shredded Plastic 15T(given to various Panchayats and
Municipalities for road tarring works)
Rejects and Leather Waste 27T
Dumped Legacy Waste 263T
TOTAL 331 Tonnes
expenses of Rs.
1,22,59,924/- on concretization of existing tar road and
claimed the same as revenue deduction while computing
the total income ... exten t of Rs.
1,22,59,924/- on concretization of tar road and claimed
the expenditure as revenue expenditure. However
that as the 8th Respondent's premises is laid with
tar road and the sprinkling activity is done on a regular basis, the
applicant ... conditions.
18. When the matter was being heard, laying of the tar
road was insisted. On 19.12.2024, the 7th Respondent filed
photographs to show that
that as the 8th Respondent's premises is laid with
tar road and the sprinkling activity is done on a regular basis, the
applicant ... conditions.
18. When the matter was being heard, laying of the tar
road was insisted. On 19.12.2024, the 7th Respondent filed
photographs to show that
Dindigul - Pollachi By-Pass Road or the Palani -
Udumalpet Road.
4. Admittedly, none of these approach roads are laid with tar topping
or even concrete ... stone crushing, which is one of the raw
material for laying tar roads, the Panchayat also can mobilize these
Page 2 of 3
quarry owners
said
roads are also used by general public for transportation.
4. I submit that, as the said roads are katcha roads and not tar roads ... should be
bilane road system to approach the stone crushing unit and the approach road should
be properly laid with tar and concrete