News Item Published In &Quotthe Times Of ... vs Union Of India on 8 April
creek bed
ecosystem due to the said activities (construction and
removal of temporary roads and its associated activities)
with importance to Planktons community.
Remote sensing ... marine) along the creek
before laying of temporary approach roads, after laying of
temporary approach roads and post removal of temporary
roads to quantify damages
local people and send to North
Bengal Medical College& Hospital for Post Mortem. (Copy of the
preliminary report of Baniakhari Tripali Jote vide Memo ... Infront of Barsana hotel. Temporary shed
along with fan and light is to be installed at the Check post by
Matigara Panchayat Samity
held that the structures in existence were not of temporary
nature and were constructed post 2003. The same were not being reflected
in the Google ... Anjuna Village cannot
be called as a temporary structure and the same is permanent
in nature with a cemented plinth, wooden floor; steel pipes
post judgment stage. Vide
judgment dated 15.04.2021, the Tribunal dealt with the grievance against
proposed temporary bridge along Adyar River and its embankment in
place
inside the premises and from the natural drain/trench by making
a temporary bund in the natural drain/trench passing near
Gumanpura Village. The wastewater ... evidence for lifting of wastewater and
dredging of soil.
GPCB carried out post-monitoring of the accident on 02/03/2021
to verify action taken
during monsoon monitoring and 9 mg/I
during post-monsoon monitoring. The BOD value of treated waste
12
water from Diggian STP was found ... during monsoon
monitoring and 25 mg/1 during post-monsoon monitoring.
b) Diggian STP, Chandigarh was also found to be discharging
untreated sewage through
District Administration.
27. Replenishment study and pre The Lessee has submitted
and post monsoon rate of replenishment study
assessment not conducted. report of Kenapali Sand ... mineable
reserve as per mining plan
was 43519 cum and after
post mineable reserve is
63045 cum. The
Replenishment study was
done
structure existed. All the documents relied upon have
been found to be post 1991. In the survey plan prepared in 2014 no
structure was found ... found
to be unrelated to the property in question. Document relating to
temporary structure relied upon by the appellant were not from any
authorized authority