Finance charges
vi. Advertisement and other related cost of alternate coal
procurement tenders
vii. Rake escorting charges
viii. GCV Sampling and testing charges
ix. Unloading ... coal and therefore form a part of Energy Charges.
vi. Rake Escorting Charges
Rake Escorting Charges are the costs incurred by TSPL in
escorting
calculate energy charges;
iii. Denial of road transportation cost - at the plant-end and at the
mine-end;
iv. Denial of Liaising charges;
v. Denial ... Transit and handling losses;
vi. Denial of Third party coal testing charges; and
vii. Non-Payment of Capacity Charges for the period from
Gvk Power (Goindwal Sahib) Limited vs Punjab State Power Corporation Limited ... on 26 February, 2020
appellant had to pay
inspection charges towards inspection of equipment, testing charges,
_________________________________________________________________________________
Appeal No.54/2020 Page 39 of 63
publication charges
towards maximum demand charges, development
charges and low power factor penalty charges for the
power supplied to the plant for testing and commissioning
during ... except the other charges namely demand and
energy charges.
54. As indicated above, under the PPA only demand charges
and energy charges applicable
Coastal Gujarat Power Limited vs Central Electricity Regulatory ... on 27 April, 2021
IN THE APPELLATE
have a shear zone parallel to HRT causing
damages to HRT during testing and commissioning. If the
shear zone was present at shallow depth parallel ... their findings that
the damages to HRT post construction and during testing
and commissioning of the project was beyond the control of
Everest Power
Grid.
6.3.4 (i) If a Unit's Tested Capacity after the most recent
Performance Test mentioned in Article 6.3.3 has been
conducted, is less ... reduced to its
Tested Capacity, as existing at the most recent
performance test referred to in Article 6.3.3 and
Quoted Capacity Charges shall be paid
even if the existing line were
used, it would not pay fixed charges, less ROE for the
unutilized capacity of the plant until ... testing and commissioning of its units and declaring
COD, as transmission line was unreliable and the
Administration had not agreed to pay fixed charges
illegally denying witnessing the commissioning
test of Third Unit (Unit No.1) so as to avoid payment of capacity
charges in terms ... charges
calculated on normative availability of contracted
capacity of the Third Unit (Unit 1) for the period the
Unit is available for conducting Commissioning Tests