complainant for proving that the
loss/damage was caused to the cooling tower on account of storm
and he has failed to discharge that onus ... Strangely, Parveen
Kumar Goyal, Surveyor and Loss Assessor, found that cooling tower
collapsed and got damaged and that there was no damage to the
abutting
developing said project was
duly executed on 15.04.2009 amongst C & C Towers Ltd.; GMADA;
State Government of Punjab, through the State Transport Department ... early
morning of 6/7.09.2011, some constructed portion of Tower-C
collapsed, due to no fault of the opposite parties and the same
developing said project was duly executed on 15.04.2009 amongst
C & C Towers Ltd.; GMADA; State Government of Punjab, through
the State Transport Department ... early morning of
6/7.09.2011, some constructed portion of Tower-C collapsed, due
to no fault of the opposite parties and the same
defect. It is surprising to note that out of 300 tower cranes, only the tower cranes in question, crashed and stood completely smashed ... roof top that it was due to manufacturing defect that the tower crane collapsed. Moreover, the facts of this case, speak for themselves. The life
September 2011, some constructed portion of tower C of OPs
collapsed, which further caused set back to the construction
process in the project. There remained ... September, 2011, some constructed portion of tower C of OP
was collapsed, which further caused set back to the construction
process. There was non-availability
high velocity storm three
towers bearing no. 24/0, 23/5 and 23/4 collapsed, and this led to huge material
losses to the Complainant ... delivery of equipment/material survey, foundation, erection, stringing, testing
and commissioning of tower package on the Site. In order to protect the towers
on Site
structures by Government of Punjab and GMADA and collapse of constructed and built up area of tower C without any fault
lifts mishap in the said tower. If any lady or old person stuck in a lift they may be collapsed due to heart failure because
allotment.
The OP allotted apartment No. 503, 5th Floor, Bango Palm B-Tower in the said project to the complainants.
The changed apartment was similar ... allotment was changed to apartment
No. 503, 5th Floor, in Peach Palm Tower-A of similar specifications
in the said project in order to give
keeping in mind the importance of the conference, hired two heavy duty Tower air conditioners on 13-06-2014 and the same were pressed into ... argument of the OP that the air conditioning system collapsed owing to natural calamity. Drawing our attention to the copy of The Telegraph, Kolkata edition