power generated by it in the following manner:
• Phase - I & II (9.80 MW)
75% of generated power sale to Discom.
25% of generated power ... provision, obviously generator, as owner of generated energy has right to declare at any stage before meter readings, as to how much generated energy
Greenko
Bagewadi Wind Energies Pvt Ltd is a 34 wind power developer situated
State of Karnataka wind power generating capacity in the state ... Wind Energy (Karnataka) Pvt. Ltd., Renew Wind Energy (AP)
Pvt. Ltd., Renew Saur Urja Pvt. Ltd. and Renew Wind Energy (Budh 3)
Pvt. Ltd., generating
this appeal is
M/s. Tadas Wind Energy Private Limited ("Tadas"). Tadas is a
wind energy generator and has established an aggregate
capacity ... generation of power
commenced. Thus, it is clear that once the generating
plant reaches the commercial operation date, it will have
to start generation
also could not procure adequate wind energy
due to the reasons that addition in wind energy generation capacity
was quite low in comparison of earlier ... well as other persons consuming electricity
generated from conventional Captive Generating Plant or procuring electricity
from conventional generating stations through open access and third party
Respondent made the following submissions:
(i) The Wind Energy Generators generate wind energy and
supply the same to the Electricity Board with a right ... Wind Energy Units without the banking facilities due
to the very characteristics of wind power generation. It was
only because of the promises made
river
power project. In case of wind, the wind
generation is confined to the wind season wherein
the maximum generation would be available and
during ... wind season the wind generation
almost comes to nil. Even during the wind season
there are daily variations in generating capacity. If
the transmission system
Gujarat.
1.2 The Respondent No. 1, Renew Wind Energy (Rajkot) Private Limited is a
wind generator who has set up 25.2 MW Wind Turbine Generators ... from cross
subsidy surcharge for sale of wind energy to third party so far as wind
energy generators set up under preferential mechanism
Page 31 of 80
purchase of wind power by Distribution Licensee from
Wind Energy Generators (WEGs). The open access
charges and other terms and conditions ... Clause 3.7: Banking of Surplus Wind Energy
2.12.1 Proposed in Discussion Paper "Since, Wind Power
generation is intermittent in nature, as a promotional
Appeal
been set-up in the
State. The wind energy produced by the wind power
generators in the State is primarily captively consumed
by captive consumers ... parameters adopted for
determination of tariff for supply of wind energy from
Wind Energy Generators to the Distribution Licensees.
(c) The Appellants are aggrieved
heavy
penetration of infirm generation above the contracted
capacity has well justified locus since the excessive
generation from these wind generators beyond the scope ... heavy penetration of
infirm generation above the contracted capacity has well
justified locus since the excessive generation from these
wind generators beyond the scope