carryout the work as per the tabulated
norms and the work was performed in a slow manner and without expediting the
work, he wrote letters ... which, under clause 12, all the risk of loss of or damage
to work, physical property and of personal injury and death which arise during
department is to protect
the monuments by carrying out appropriate repair works
without damaging the original structures. It is also the duty of
the state ... note of
the old sculptural works and the renovating works have to be
carried out without causing any damage to its originality.
However, the same
company, on 05.12.2011 this section of workmen resorted to work stoppage, sabotage. They damaged some of machinery and cut the conveyor belt. In that context ... that the lifting of the lock out and resumption of work depends on the working condition of the factory being restored and that depends upon
company, on 05.12.2011 this section of workmen resorted to work stoppage, sabotage. They damaged some of machinery and cut the conveyor belt. In that context ... that the lifting of the lock out and resumption of work depends on the working condition of the factory being restored and that depends upon
fact that the plaintiffs have not sustained damage or sensible injury by reason of the works which have been carried out by the defendant ... right of the plaintiffs had been invaded, no damage had accrued and no case of prospective damage had been made out. We find
depute the specialists to advise, guide and supervise the erection work. Any damage to the plants, equipments, etc., caused by gross errors in drawings ... actual period for which they would work would depend on the progress of the erection work at the site. The deputed personnel were
defined. The two principal categories are where the work to be done involves either (1) special damage to others, or (2) danger on the highway ... party wall, excavation work when a duty is cast on the servient owner, to see that no damage should happen to the dominant owner
which it was leased or fell timber, pull down or damage buildings, work mines or quarries not open when the lease was granted, or commit
works or f. o. r. works) the seller's responsibility for any loss of, shortage in/or damage to cement during transit ... goods but our responsibility for shortage, loss, delay or
damage ceases after delivery at works siding. All such claims should be
preferred against the carriers
trainee shows lack of interest in training or neglect his work, disciplinary action will also be taken. The Trainees are required to attend the classes ... cautioned about his unauthorised absence for 32 days. On 3.2.1986, he damaged a work in progress for which he was given a warning memo, dated