prevent loss or
damage. He shall be liable for any damage or loss that may
happen to the works or any part thereof ... prevent loss or damage or minimise the amount of such loss
or damage. Final assessment of loss or damage shall be
decided by the Engineer
dewatering works/measures.
Percentage rates quoted by Tenderer will be deemed to
have covered expenses for such dewatering
works/measures. Such temporary works shall ... quantity of work and material necessary for the entire completion of
the work, and the means and access to the work or other
accommodation
contractor suffers extra
expenses and losses during execution of work owing to situations not made
known by the owner or due to faulty specifications. Counsel ... contractor will not be liable to the owner for
loss or damage which results from the insufficiencies or defects in the
information, plans and specifications
heavy flow of water from the Katra and
it damaged the Katra site tunnel work. A technical team was sent ... construction of all the tunnels as some portals were damaged and the
entire work was abandoned. The consultants from railways suggested to
start work again
start of work by these agencies, they had dismantled
and damaged the finished work of the respondent. The agencies were not
equipped by adequate material ... water logging in the
basement. This resulted in spoiling/damaging the finished work. The
construction activity also suffered on account of the water logging
inspected the suit
property and noticed that all doors were damaged, locks were not
working, keys were missing, windows were missing, all light
fittings were
Payment on account of Rejected 4,37,198.96 Nil
rectification of
damaged work
executed through new
contractor
5 Litigation cost Rejected ... compelled to call for fresh tenders, both for rectification of the damaged
work and for execution of the balance work, which the respondent had
abandoned
rising rapidly due to
rains. The appellant was carrying on work downstream and work front
suffered the fury of the flood that ensued. The site ... directions issued by NHPC, re-
execution of the works for restoration of the works lost and damaged
had been taken up. Repairs of the plant
same if there is damage due to rains. AT noted that
there was no damage to the work but the claim was awarded for dewatering ... maintaining in good condition all the work
executed till completion of the entire work; nor on account of damage to the
Signature Not Verified
Digitally
after
the award of the work, the petitioner started the work in right earnest on
January 4, 2012. The work was completed on December ... damage done by M/s NCC.
47. Despite knowing that the damage was done by M/s NCC, the
petitioner repaired the damage as asked