submerged the
worksite and vast adjacent areas causing extensive damage to the works already
executed by the claimant, causing damage to the machinery and equipments ... loss
and damage on account of works re-executed by the claimant due to flood during
July
electric lines and materials, interference with meters and breaking or damaging works or cutting of supply of electricity are provided in Sections
power-play boilers and all other machinery and apparatus in good working order; damage to fire, tempest, earthquake, air-raid or any other force majeure ... together with all plant, machinery and fixtures in proper working condition, wear and tear, damage by fire, earthquake and other forced injury being excepted
Form No.2911(II) inter alia specifies that if any damage happens to the work
while in progress due to any cause or any imperfection ... part of it is
being executed, or if any damage shall happen to the work while in progress,
from any cause whatever or any imperfections
that all materials (e. g., store and other materials) obtained in the work of dismantling, excavation, etc., will be considered Government property and will ... which is as follows :
Sir,
In connection with the above flood damage repair work I am badly in need of collecting 453 cm. of stone
completion of works was upto March 3, 1985. A provision was made in the work order in respect of liquidated damage as follows ... fault of the party. No liquidated damage as per provision made in the work order was imposed on the contractors. Even the outstanding dues
other vying for space. Digging of road for maintenance and developmental work causes damage to these cables and pipes. It has been alleged that ... free from interruptions, the Department shall not be responsible for any loss, damage or inconvenience caused to the user as a result of interruptions
special Act, to detain a ship in respect of damage is dock works, or to detain and sell a ship in respect of damage
value of the work executed during the extended period of the work and assessed
10% of the work done during such extended period ... repair of WBM work, the arbitrator
reasoned that the bituminous work was required to be done long after the WBM
work had been completed
relaying the reinforcement
after completion of the connected electrical works. The petitioner had clarified
that damage cost if payable will be settled considering several factors ... casting was delayed
and claimant had to incur damage. The arbitrator considered the evidence
produced regarding damage to the shuttering materials, clearing the refugees
generated