with both.
50. Section 138 relates to the interference with meters or works of licensee.
As per this Section, whoever unauthorisedly or maliciously tampers with ... with both.
51. Section 139 deals with negligently breaking or damaging works.
According to this Section, whoever negligently breaks, injures, throws down or
Page
left bank
protection works of dam due to cloud burst, damage to civil
works on account of cavity formation in crown and left wall ... rectification of HRT while Rs.1387
lacs for rectification of damaged works in dam, pressure
shaft, surge shaft and power house were disallowed.
Page
Taxus Infrastructure & Power Projects ... vs Gujarat Electricity Regulatory ... on 4 July, 2018
A.NO
materials, interference with meters or works of licensee, negligently
breaking or damaging works, intentionally injuring works, extinguishing public
lamps and non-compliance of directions issued
repairs and/or replacement of the portion of the 'Works' damaged or lost for the timely commissioning of the equipment/completion ... contract price whereas liquidated damage to be borne by the assessee was 17.5% of the aggregate contract price which works out to Rs. 184 crores
said pit. The quantity of Molasses lost in the damage worked out to 1202.180 M/Tons, then the same would not have been lost ... said pit. The quantity of Molasses lost in the damage worked out to 1202.180 M/T. From the facts narrated it is clear that
which are due to the contractors risks:
A) loss of damage to the work
B) Loss of or damage to the works, plant and materials ... Loss of or damage to property (Except the works, plant,
material and equipment) in connection with the contract; and
D) Personal injury or death
flow of water, in or from any irrigation work so as to endanger, damage
or reduce its utility.
(2) when a person is arrested ... boundaries of tank, canal or channel relating to the irrigation
work and damaging of irrigation works i.e., damages, alters, enlarges or obstructs any
irrigation
liquidated damages recovered by the respondent, in
excess of the liquidated damage worked out for this period, shall be
____________________________________________________________________
Review Petition
done or only repair work or
strengthening work of the old jetties has been done
(iii) Whether any environmental damage has been caused ... done or only repair work or
strengthening work of the old jetties have been done.
(iii)Whether any environmental damage has been caused