working properly.
Low quality material provided.
i) Other slider gate is not working at all. Working
properly.
j) 30% plants are damaged. Work completed ... working properly.
Low quality material provided.
h) Other slider gate is not working at all. Working
properly.
i) 30% plants are damaged. Work completed
WORKS
EXECUTED BUT NOT PAID:
This claim is disallowed.
CLAIM NO. 4: LOSS OF PROFIT ON THE VALUE OF THE BALANCE
WORK UNEXECUTED ... REIMBURSEMENT OF PAYMENT TOWARDS THE
EXECUTION/RECTIFICATION OF CYCLONE DAMAGE WORKS:
This claim is disallowed.
CLAIM NP.8: PAYMENT TOWARDS LABOUR AND MATERIAL
ESCALATION PAYABLE
WORKS
EXECUTED BUT NOT PAID:
This claim is disallowed.
CLAIM NO. 4: LOSS OF PROFIT ON THE VALUE OF THE BALANCE
WORK UNEXECUTED ... REIMBURSEMENT OF PAYMENT TOWARDS THE
EXECUTION/RECTIFICATION OF CYCLONE DAMAGE WORKS:
This claim is disallowed.
CLAIM NP.8: PAYMENT TOWARDS LABOUR AND MATERIAL
ESCALATION PAYABLE
regarding failure of the Contractor to
maintain work site. GCC Clause 4.31 has been cited by the
Respondent empowering the Engineer to clear the site ... Respondent for BSES cable damage.
5.9.1 During execution of work damage to a utility cable
of M/s BSES took place. The Engineer
Bsc C&C Joint Venture, New Delhi vs Dcit Circle-61(1),, New Delhi
extensive damage to the ovaries and fallopian tubes. Fallopian tube damage can increase your chance of having an ectopic pregnancy.
Sometimes, fallopian damage can result ... fallopian tubes, increasing your chances of conception. If both ovaries are damaged, working with an egg donor may provide a way for you to become
beginning carried
out the work to the utmost satisfaction of defendants company
and the campaign continued. It is submitted that work done by
the plaintiff ... stated that plaintiff never rectified the electrical
problem of damaged/non-working Halogen bulbs and of fuse in
time, and additionally, plaintiff failed to provide
stated that no escalation was to
be paid for the work executed in the extended period of the
contract as per clause 10CC ... towards
damages on account of delay in execution of work, damage due
due to shifting of site and prolongation of work and damages
Some of the
houses and cowsheds were found
damaged/demolished and abandoned.
The crate protection work provided to GMS
Motla was found damaged ... road
construction work had executed the work negligently
and in unscientific manner which has caused loss to
the village (in terms of damage to natural
Final Surveyor to assess the work loss and estimate the damage done to the work. The Final Surveyor assessed the loss ... contended that the work executed by the Complainant was an unprotected / unsecured work and it was susceptible to damage even for a flood