where
glazed screen printed tiles work executed, no such type of work was found to
be executed through this work order. In respect of item ... Satya Constructions
(b) Work : Miscellaneous finishing work at TE Building,
Idgah
(c) Result of physical inspection :
No work was found to be executed
claim for an amount spent
by him on restoration of flood damaged works and construction of Bund. An
amount ... estimates prepared by the department for
restoration of the flood damaged works were not admission by the
petitioners with regard to the entitlement
prevent loss or
damage. He shall be liable for any damage or loss that may
happen to the works or any part thereof ... prevent loss or damage or minimise the amount of such loss
or damage. Final assessment of loss or damage shall be
decided by the Engineer
dewatering works/measures.
Percentage rates quoted by Tenderer will be deemed to
have covered expenses for such dewatering
works/measures. Such temporary works shall ... quantity of work and material necessary for the entire completion of
the work, and the means and access to the work or other
accommodation
carryout the work as per the tabulated
norms and the work was performed in a slow manner and without expediting the
work, he wrote letters ... which, under clause 12, all the risk of loss of or damage
to work, physical property and of personal injury and death which arise during
working properly.
Low quality material provided.
i) Other slider gate is not working at all. Working
properly.
j) 30% plants are damaged. Work completed ... working properly.
Low quality material provided.
h) Other slider gate is not working at all. Working
properly.
i) 30% plants are damaged. Work completed
Ghaggar was damaged. On discovery of this defect, the petitioner as Executive Engineer (Designs) was asked to propose repairs to the damaged work. The petitioner ... complaint of any kind about this work. About five months after the discovery of the damage, Shri Lehri Singh, Minister of Irrigation, sent a commendatory
rates etc. or
charges for restoring damages to the works plant or
material.
17. DAMAGE ... WORKS
From the commencement to the taking over of the works
by the Department the contractor shall be responsible for
any damage or loss
Singh and AP Punj, who were working as Junior Engineers submitted the estimated costs of the four works at Rs. 32 lacs ... other hand, petitioner Nos. 1 and 2 estimated the costs of damaged work to be Rs. 28.75 lacs. The FIR is stated to be registered
contractor suffers extra
expenses and losses during execution of work owing to situations not made
known by the owner or due to faulty specifications. Counsel ... contractor will not be liable to the owner for
loss or damage which results from the insufficiencies or defects in the
information, plans and specifications