State of Madhya Pradesh - Section

Section 6 in Madhya Pradesh Electricity Regulatory Commission (Forecasting, Scheduling, Deviation Settlement Mechanism and related matters of Wind and Solar generating stations) Regulations, 2018

6. Forecasting, scheduling and elimination of gaming.

(a)Procedure: -
(1)The provisions of the Grid Code and the M.P. Electricity Regulatory Commission (terms and Conditions for intra-state open access in Madhya Pradesh) Regulations, 2005 as amended from time to time, shall be applicable for declaration of capacity, scheduling and elimination of gaming.
(2)The generating station, as far as possible, shall generate electricity as per the day-ahead generation schedule finalized by the State Load Dispatch Centre in accordance with the Grid Code.Provided that the revision in generation schedule on the day of operation shall be permitted, in accordance with the procedure specified under the Grid Code and M.P. Electricity Regulatory Commission (terms and Conditions for intra-state open access in Madhya Pradesh) Regulations, 2005 as the case may be.
(3)The wind and solar generator or the QCA, as the case may be, shall have the option of accepting the concerned SLDC's forecast for preparing its schedule or provide the concerned SLDC with a schedule based on its own forecast, and such schedule shall be used as reference for deviation settlement.
(4)The QCA shall coordinate the aggregation of schedules of all generators connected to a pooling station and communicate it to the SLDC. The QCA shall undertake all commercial settlement on behalf of the wind or solar generators) connected to the respective pooling station(s).
(5)The plan for data telemetry, formats of forecast submission and other details in this regard shall be provided in the Detailed Procedure to be prepared by SLDC and approved by the State Commission.
(6)The Commission, either suo-motu or on a petition made by SLDC, or any affected party, may initiate proceedings against any generating company or seller on charges of gaming and if required, may order an inquiry in such manner as decided by the Commission. When the charge of gaming is established in the above inquiry, the Commission may, without prejudice to any other action under the Act or Regulations thereunder, disallow any charges for Deviation received by such generating company or the seller during the period of such gaming.
(7)The charges for deviation for wind and solar generators which are state entities undertaking inter-state or intra-state transactions, shall be governed as per the provisions outlined under the following sub-clauses of this regulation.
(b)The wind or solar generators which are state entities undertaking intra/inter-state transactions shall be paid as per schedule generation.
(i)In the event of actual generation being lesser than the scheduled generation, the deviation charges for shortfall in generation shall be payable by such wind or solar generator which are state entities into State Deviation Pool Account as given in Table -I of Schedule.
(ii)In the event of the actual generation being more than the scheduled generation, the Deviation Charges for excess generation shall be payable to the wind or solar generators which are state entities undertaking inter-state transactions from State Deviation Pool Account as given in Table - II of Schedule.
(iii)The wind or solar generators which are state entities undertaking intra-state transactions, shall be paid as per actual generation.
(iv)In the event of actual generation of a generating station or a pooling station, as the case may be, being less or more than the scheduled generation, the deviation charges for shortfall or excess generation shall be payable by the wind mid solar generator or the QCA, as the case may be, to the State Deviation Pool Account, as given in Table - III or Table-W of Schedule. as the case may be.
(c)In case of wind or solar generators as state entities undertaking intra-state transactions and inter-state transactions shall be allowed provided that such generators are connected to separate feeders at LV side of the Pooling Substation and metering, scheduling, energy accounting and deviation settlement account for such wind or solar generators are maintained separately.
(d)Where the Fixed Rate referred under Table-I and Table-II of Schedule is the PPA rate as determined by the Commission under section 62 of the Act or adopted by the Commission under section 63 of the Act. In case of multiple PPAs, the weighted average of the PPA rates shall be taken as the Fixed Rate. The wind and solar generators shall furnish the PPA rates on affidavit for the purpose of Deviation charge account preparation to concerned SLDC supported by copy of the PPA.
(e)Fixed Rate for Open Access participants selling power which is not accounted for RPO compliance of the buyer, and the captive wind or solar plants shall be the Average Power Purchase Cost (APPC) rate at the National level, as may be determined by the Central Commission from time to time through a separate order.
(f)With regard to inter-state wheeling transactions of Wind and Solar Generating stations as State Entities, for balancing of deemed renewable purchase obligation (RPO) compliance of buyers with respect to schedule, deviations by all wind and solar generators which are state entities shall first be netted off for the entire pool on a monthly basis and any remaining shortfall in renewable energy generation must be balanced through purchase of equivalent solar and non-solar Renewable Energy Certificates (RECs), as the case may be, by SLDC by utilizing funds from the Pool Account. For positive balance of renewable energy generation, equivalent notional RECs shall be credited to the DSM Pool and carried forward for settlement in future.
(g)State Load Dispatch Centre or the Secretariat of State Power Committee, as the case may be shall maintain separate records and account of time-block wise schedules, actual generation and deviations for all generators, including wind and solar generators.
(h)Once the accounting procedures as above are put in place, all Wind and Solar generators shall be treated together as a virtual pool within the State Deviation Pool Account. Deviations for and within this virtual pool could be settled first at the rates and methodology stipulated above for wind and solar generators.