Section 20(2)(i) in The Bangalore Metro Railway (General) Rules, 2011
(i)all communication between Operations Control Center and train operators, Station Controller, maintenance staff of electrical, rolling stock, signal and telecommunication and track and structures department and others pertaining to movement of trains shall be tape-recorded and preserved for 'incident, analysis and, training, and the mode of preservations and its duration shall be specified in special instructions;