[Cites 0, Cited by 0] [Section 2] [Entire Act]

State of Rajasthan - Subsection

Section 2(54) in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009

(54)"Scheduled Generation" or 'SG' at any time or for any period or time block means schedule of generation in MW ex-bus given by the State Load Despatch Centre;Note. - For the gas turbine generating station or a combined cycle generating station if the average frequency for any time block, is below 49.52 Hz but not below 49.02 Hz and the scheduled generation is more than 98.5% of the declared capacity, the scheduled generation shall be deemed to have been reduced to 98.5% of the declared capacity, and if the average frequency for any time block is below 49.02 Hz and the scheduled generation is more than 96.5% of the declared capacity, the scheduled generation shall be deemed to have been reduced to 96.5% of the declared capacity.