Union of India - Subsection

Section 8(1A) in Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009

(1A)[ Projects based on storage source (s) shall apply for connectivity for the quantum of maximum injection or maximum drawal whichever is higher and shall sign separate agreement for both injection and drawal of power;] [Added by Notification No. L-1/(3)/2009-CERC, dated 9.1.2019 (w.e.f. 7.7.2009).]