Section 4(4)(a) in The Maharashtra Electricity Regulatory Commission (Distribution Open Access) Regulations, 2014

(a)Admissible drawal = Minimum of (Original Contract demand (10 MW) and (Sum of (Scheduled entitlement from Open Access (4 MW) + (Revised contract demand with the Distribution Licensee (6 MW)), which shall be a ceiling of 10 MW.