[Cites 0, Cited by 0] [Section 2(1)] [Section 2] [Entire Act]

Union of India - Subsection

Section 2(1)(f) in Central Electricity Regulatory Commission (Sharing of Inter State Transmission Charges and Losses) Regulations, 2010

(f)[ "Approved Withdrawal" means the withdrawal in MW computed by the Implementing Agency for each application period on the basis of the actual peak met during the corresponding application periods of last three (3) years and validated by the Validation Committee for any DIC in a control area after taking into account the aggregated withdrawal from all nodes to which DIC is connected and which affect the flow in the ISTS, and the anticipated maximum demand to be met as submitted by the DIC: [Substituted by Notification No. L-1/44/2010-CERC, dated 1.4.2015 (w.e.f. 15.6.2010).]