Section 7(5) in Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2014

(5)Methodologies for the computation of Charges for Deviation and Additional Charges for deviation for each regional entity for crossing the volume limits specified for the under-drawal /over-injection and for over-drawal and under-injection in clause (3) of this regulation shall be as per [Annexure I, Annexure I-A and Annexure-II, Annexure-II-A] [Replaced 'Annexure-I and II' by Notification No. L-1/(3)/2009-CERC, dated 6.5.2016 (w.e.f. 6.1.2014).] of these Regulations respectively.