Union of India - Act
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2014
UNION OF INDIA
India
India
Central Electricity Regulatory Commission (Deviation Settlement Mechanism and Related Matters) Regulations, 2014
Rule CENTRAL-ELECTRICITY-REGULATORY-COMMISSION-DEVIATION-SETTLEMENT-MECHANISM-AND-RELATED-MATTERS-REGULATIONS-2014 of 2014
- Published on 6 January 2014
- Commenced on 6 January 2014
- [This is the version of this document from 6 January 2014.]
- [Note: The original publication document is not available and this content could not be verified.]
1. Short title and commencement.
2. Definitions and Interpretation.
3. Objective.
- The objective of these regulations is to maintain grid discipline and grid security as envisaged under the Grid Code through the commercial mechanism for Deviation Settlement through drawal and injection of electricity by the users of the grid.4. Scope.
- These regulations shall be applicable to sellers and buyers involved in the transactions facilitated through short-term open access or medium-term open access or long-term access in inter-State transmission of electricity.5. Charges for Deviations.
| [Average Frequency of the time block(Hz) [Substituted by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).] | Charges for Deviation (Paise/k Wh) | |
| Below | Not Below | |
| 50.05 | 0.0 | |
| 50.05 | 50.04 | Slope determined by joining the price at NotBelow 50.05 Hz and identified price at 50.00 Hz, and as detailedin the note below this Regulation |
| 50.04 | 50.03 | |
| 50.03 | 50.02 | |
| 50.02 | 50.01 | |
| 50.01 | 50.00 | Daily (simple) average Area Clearing Pricediscovered in the Day Ahead Market segment of power exchange |
| 50.00 | 49.99 | Slope determined by joining the priceidentified at 50.00 Hz and price at below 49.85 Hz, and asdetailed in the note below this Regulation |
| 49.99 | 49.98 | |
| 49.98 | 49.97 | |
| 49.97 | 49.96 | |
| 49.96 | 49.95 | |
| 49.95 | 49.94 | |
| 49.94 | 49.93 | |
| 49.93 | 49.92 | |
| 49.92 | 49.91 | |
| 49.91 | 49.90 | |
| 49.90 | 49.89 | |
| 49.89 | 49.88 | |
| 49.88 | 49.87 | |
| 49.87 | 49.86 | |
| 49.86 | 49.85 | |
| 49.85 | 800.00 |
| Sr. No. | Absolute Error in the 15-minute time block | Deviation Charges payable to Regional DSM Pool |
| 1 | < = 15% | At the Fixed Rate for the shortfall energy forabsolute error upto 15% |
| 2 | >15% but <= 25% | At the Fixed Rate for the shortfall energy forabsolute error upto 15% + 110% of the Fixed Rate for balanceenergy beyond 15% and upto 25% |
| 3 | >25% but <=35% | At the Fixed Rate for the shortfall energy forabsolute error upto 15% + 110% of the Fixed Rate for balanceenergy beyond 15% and upto 25%+ 120% of the Fixed Rate forbalance energy beyond 25% and upto 35% |
| 4 | > 35% | At the Fixed Rate for the shortfall energy forabsolute error upto 15%+ 110% of the Fixed Rate for balanceenergy beyond 15% and upto 25%+ 120% of the Fixed Rate forbalance energy beyond 25% and upto 35%+ 130% of the Fixed Ratefor balance energy beyond 35% |
| Sr. No. | Absolute Error in the 15-minute time block | Deviation Charges payable |
| 1 | < = 15% | At the Fixed Rate for excess energy upto 15% |
| 2 | >15% but <= 25% | At the Fixed Rate for excess energy upto 15%+90% of the Fixed Rate for excess energy beyond 15% and upto 25% |
| 3 | >25% but <=35% | At the Fixed Rate for excess energy upto 15%+90% of the Fixed Rate for excess energy beyond 15% and upto 25%+80% of the Fixed Rate for excess energy beyond 25% and upto 35% |
| 4 | > 35% | At the Fixed Rate for excess energy upto 15%+90% of the Fixed Rate for excess energy beyond 15% and upto 25%+80% of the Fixed Rate for excess energy beyond 25% and upto 35%+70% of the Fixed Rate for excess energy beyond 35% |
| Domestic coal/ Lignite/Hydro | L1.78 / kWh sent out |
| APM gas as fuel | L2.82/ kWh sent outup to 31.3.2014 and thereafter,L5.64/ kWh sent out |
| Imported Coal | L3.03 / kWh sent out |
| [RLNG [Substituted 'RLNG Rs 8.24 / kWh sent out' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).] | L8.00 / kWh sent out] |
6. Declaration, scheduling and elimination of gaming.
7. Limits on Deviation volume and consequences of crossing limits.
| When 12% of Schedule is less than or equal to 150MW | ||
| (i) | For over drawal of electricity by any buyer inexcess of 12% and up to 15% of the schedule in a time block | Equivalent to 20% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (ii) | For over drawal of electricity by any buyer inexcess of 15 % and up to 20% of the schedule in a time block | Equivalent to 40% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (iii) | For over drawal of electricity by any buyer inexcess of 20 % of the schedule in a time block | Equivalent to 100% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (iv) | For under injection of electricity by any sellerin excess of 12% and up to 15% of the schedule in a time block | Equivalent to 20% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (v) | For under injection of electricity by any sellerin excess of 15 % and up to 20% of the schedule in a time block | Equivalent to 40% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (vi) | For under injection of electricity by any sellerin excess of 20 % of the schedule in a time block | Equivalent to 100% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| B | When 12% of Schedule is more than 150 MW | |
| (i) | For over drawal of electricity by any buyer isabove 150 MW and up to 200 MW in a time block | Equivalent to 20% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (ii) | For over drawal of electricity by any buyer isabove 200 MW and up to 250 MW in a time block | Equivalent to 40% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (iii) | For over drawal of electricity by any buyer isabove 250 MW in a time block | Equivalent to 100% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (iv) | For under injection of electricity by any selleris above 150 MW and up to 200 MW in a time block | Equivalent to 20% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (v) | For under injection of electricity by any selleris above 200 MW and up to 250 MW in a time block | Equivalent to 40% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (vi) | For under injection of electricity by any selleris above 250 MW in a time block | Equivalent to 100% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| When 12% of Schedule is less than or equal to 150MW | ||
| (i) | For under injection of electricity by any sellerin excess of 12% and up to 15% of the schedule | Equivalent to 20% of the[[Cap Rate for Deviation of 303.04 Paise/kWh] [Substituted 'Cap Rate for Deviations of 303.04 Paise/kWh' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]] or the Charge for Deviation corresponding toaverage grid frequency of the time block, whichever is less. |
| (ii) | For under injection of electricity by any sellerin excess of 15 % and up to 20% of the schedule | Equivalent to 40% of the[[Cap Rate for Deviation of 303.04 Paise/kWh] [Substituted 'Cap Rate for Deviations of 303.04 Paise/kWh' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]] or the Charge for Deviation corresponding toaverage grid frequency of the time block, whichever is less. |
| (iii) | For under injection of electricity by any sellerin excess of 20 % of the schedule | Equivalent to 100% of the[[Cap Rate for Deviation of 303.04 Paise/kWh] [Substituted 'Cap Rate for Deviations of 303.04 Paise/kWh' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]] or the Charge for Deviationcorresponding to average grid frequency of the time block,whichever is less. |
| B | When 12% of Schedule is more than 150 MW | |
| (i) | For under injection of electricity by any selleris above 150 MW and up to 200 MW in a time block | Equivalent to 20% of the[[Cap Rate for Deviation of 303.04 Paise/kWh] [Substituted 'Cap Rate for Deviations of 303.04 Paise/kWh' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]] or the Charge for Deviation corresponding toaverage grid frequency of the time block, whichever is less. |
| (ii) | For under injection of electricity by any selleris above 200 MW and up to 250 MW in a time block | Equivalent to 40% of the[[Cap Rate for Deviation of 303.04 Paise/kWh] [Substituted 'Cap Rate for Deviations of 303.04 Paise/kWh' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]] or the Charge for Deviation corresponding toaverage grid frequency of the time block, whichever is less. |
| (iii) | For under injection of electricity by any selleris above 250 MW in a time block | Equivalent to 100% of the[[Cap Rate for Deviation of 303.04 Paise/kWh] [Substituted 'Cap Rate for Deviations of 303.04 Paise/kWh' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]] or the Charge for Deviationcorresponding to average grid frequency of the time block,whichever is less. |
| (i) | For over-drawal/under-injection of electricityabove L MW and up to L+50 MW in a time block | Equivalent to 20% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (ii) | For over-drawal / under-injection of electricityabove L+50 MW and up to L+100 MW in a time block | Equivalent to 40% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| (iii) | For over-drawal / under-injection of electricityabove L+100 MW in a time block | Equivalent to 100% of the Charge for Deviationcorresponding to average grid frequency of the time block. |
| No. of violations in a Day | Additional Charge Payable |
| From first to fifth violation | For each violation, an additional charge @ 3% ofdaily base DSM charge payable or receivable |
| From sixth to tenth violation | For each violation, an additional charge @ 5% ofdaily base DSM charge payable or receivable |
| From eleventh violation onwards | For each violation, an additional charge @ 10%of daily base DSM charge payable or receivable |
8. Compliance with instructions of Load Despatch Centre.
- Notwithstanding anything specified in these Regulations, the sellers and the buyers shall strictly follow the instructions of the Regional Load Despatch Centre on injection and drawal in the interest of grid security and grid discipline.9. Accounting of Charges for Deviation.
10. Schedule of Payment of Charges for Deviation.
11. Application of fund collected through Deviations.
- The surplus amount, if any in the Deviation Pool Account Fund as on last day of the month, shall be transferred to a separate fund namely "Power Systems Development Fund" specified by the Commission in the first week of the next month and shall be utilized, for the purpose specified by the Commission.12. Power to Relax.
- The Commission may by general or special order, for reasons to be recorded in writing, and after giving an opportunity of hearing to the parties likely to be affected by grant of relaxation, may relax any of the provisions of these regulations on its own motion or on an application made before it by an interested person.13. Power to issue directions.
- If any difficulty arises in giving effect to these regulations, the Commission may on its own motion or on an application filed by any affected party, issue such directions as may be considered necessary in furtherance of the objective and purpose of these regulations.14. Repeal and Savings.
1. When the grid frequency is [49.85 Hz and above] [Substituted '49.70 Hz and above' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]
A. When Dtb i.e. Deviation from schedule in a time block in MW is less than (+/-)12% of the schedule in MW or 150 MW whichever is lower in each time block, Dtb to be payable by the regional entity at normal Charges for Deviation;B. When Dtb i.e. Deviation from schedule in a time block in MW is more than (+/-)12% of the schedule in MW or 150 MW whichever is lower in each time block| Category | Additional Charges for Deviation |
| Dtbis above12% and up to15% of schedule in MW | 50 x (Dtb- 12% ofschedule) x Charge for Deviation corresponding to averagegrid frequency of the time block |
| Dtbis above15% and up to20% of schedule in MW | [100 x (Dtb- 15% ofschedule) + 1.50 x schedule] x Charge for Deviationcorresponding to average grid frequency of the time block |
| Dtbis above20% | [250 x (Dtb- 20% ofschedule) + 6.50 x schedule] x Charge for Deviationcorresponding to average grid frequency of the time block |
| Category | Additional Charges for Deviation |
| Dtbis above 150 MW andup to 200 MW | 50 x (Dtb- 150) xCharge for Deviation corresponding to average grid frequency ofthe time block |
| Dtbis above 200 MW andup to 250 MW | [100 x (Dtb- 200) +2500] x Charge for Deviation corresponding to average gridfrequency of the time block |
| Dtbis above 250 MW | [250 x (Dtb- 250) +7500] x Charge for Deviation corresponding to average gridfrequency of the time block |
2. When the grid frequency is [below 49.85 Hz] [Substituted 'below 49.7 Hz' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).] and above. - The charges for deviation corresponding to Dtb shall be payable by the regional entity at 1648.08 Paise/kWh including additional charges for the deviation payable by the regional entity at [800 Paise / kWh] [Substituted '824.04 Paise/kWh' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).].
Note: The charges for Deviation and the additional charges for Deviation for under injection, during the time block when grid frequency is [below 49.85 Hz] [Substituted 'below 49.70 Hz' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).], by the generation station regulated by the Commission using coal or lignite or gas supplied under Administrative Price Mechanism (APM) as the fuel shall be calculated corresponding to the [Cap Rate as specified in clause 5(3) of these Regulations] [Substituted 'cap rate for deviations of 303.04 Paise/kWh' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).].[Annexure-I-A] [Added by Notification No. L-1/(3)/2009-CERC, dated 6.5.2016 (w.e.f. 6.1.2014).]Methodologies for the computation of Charges for Deviation and Additional Charges for Deviation applicable to Renewable Rich States for crossing the volume limits specified for the over-drawal/under-injection:A. When Dtb i.e. Deviation from schedule in a time block in MW is less than limits specified in Annexure-III, in each time block, Dtb to be payable by the regional entity at normal Charges for Deviation;B. When Dtb i.e. Deviation from schedule in a time block in MW is more than limits specified in Annexure-III , in each time block| Category | Additional Charges for Deviation |
| Dtbis above L MW and up to L+50 MW | 50 x (Dtb- L) x Charge for Deviationcorresponding to average grid frequency of the time block |
| Dtbis above L+50 MW and up to L+100 MW | (100 x (Dtb-(L+50)) + 2500) x Charge forDeviation corresponding to average grid frequency of the timeblock |
| Dtbis above L+100 MW | (250 x (Dtb- (L+100)) + 7500) x Charge forDeviation corresponding to average grid frequency of the timeblock |
2. When the grid frequency is below [below 49.85 Hz] [Substituted '49.85 Hz and above' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]:
The charges for deviation corresponding to Dtb shall be payable by the regional entity at [800 Paise / kWh] [Substituted '824.04 Paisa/kWh' by Notification No. L-1/132/2013-CERC, dated 20.11.2018 (w.e.f. 6.1.2014).]. In addition, additional deviation charges for deviation for Dtb shall be payable by the regional entity at 824.04 Paise/kWh.Annexure-IIMethodologies for the computation of Charges of Deviation and Additional Charges for deviation for each regional entity for crossing the volume limits specified for the under drawal/over-injection by buyer/SellerA. When Dtb i.e. Deviation from schedule in a time block in MW is less than (+/-)12% of the schedule in MW or 150 MW, whichever is lower in each time block, Dtb to be payable by the regional entity at normal Charges for Deviation;B. When Dtb i.e. Deviation from schedule in a time block in MW is more than (+/-)12% of the schedule in MW or 150 MW, whichever is lower in each time block:| S.No | States having combined installed capacity ofWind and Solar projects | Deviation Limits (MW) - "L" |
| 1 | 1000 – 3000 MW | 200 |
| 2 | > 3000 MW | 250 |