Section 20(1)(iii) in The Bangalore Metro Railway (General) Rules, 2011
(iii)the Traffic Controller at the Operations Control Centre may adjust the timetable and may intervene manually to set and clear routes if the timetable needs to be varied or in the event of a major disruption;