State of Punjab - Subsection

Section 5(2) in Punjab State Electricity Regulatory Commission (Open Access) Regulations, 2005

(2)The existing distribution licensees shall, within 60 days of coming into force of these Regulations, furnish to the State Transmission Utility and the State Load Despatch Center, details of their use of the transmission system and/or the distribution system and the terms and conditions for such use.