Section 2(1)(c) in Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009
(c)One of the Hydro Generating stations or standalone storage project individually having less than 50 MW installed capacity, but collectively having an aggregate installed capacity of 50 MW and above, and acting on behalf of all these generating stations or Standalone Storage Project, and seeking connection from CTU at a single connection point at the pooling sub-station forming part of ISTS, termed as the lead generator, or;](cc)[ Renewable Energy generating station individually having less than 50 MW installed capacity, but collectively having an aggregate installed capacity of 50 MW and above, and one of them acting on behalf of all these generating stations, and seeking connection from CTU at a single connection point at the pooling sub-station forming part of ISTS, termed as the lead generator, or] [Added by Notification No. L-1/(3)/2009-CERC, dated 9.1.2019 (w.e.f. 7.7.2009).]