Section 126(1) in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009
(1)The average cost of supply and realization from a category of consumer shall form the basis of estimating the extent of cross subsidy for that consumer category.