[Cites 0, Cited by 0] [Section 8] [Entire Act]

Union of India - Subsection

Section 8(8) in Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009

(8)[ The dedicated transmission line from generating station of the applicant generating Company or any other entity on behalf of generating company to the pooling station of the transmission licensee (including deemed transmission licensee) shall be developed, owned and operated by the applicant generating Company or any other entity on behalf of generating company. The specifications for dedicated transmission lines may be indicated by CTU while granting Connectivity or Long term Access or Medium term Open Access:Provided that CTU shall plan the system such that maximum length of dedicated transmission line does not exceed 100 km from switch yard of the applicant till the nearest pooling substation of transmission licensee:Provided further that dedicated transmission line may exceed 100 km, if such an Applicant, so chooses:Provided also that in case any connectivity grantee is not utilizing the bay allocated to it at ISTS substation, CTU may cancel its Connectivity as per provisions of these regulations and detailed procedure and allocate the bay to other Applicant. In such an event, the original grantee shall either dismantle its bay or enter into an Agreement with a new grantee as indicated by CTU for utilization of the bay within a period of 2 months of cancellation of Connectivity.] [Substituted by Notification No. L-1/(3)/2009-CERC, dated 9.1.2019 (w.e.f. 7.7.2009).]