Section 54(2)(f) in The Static and Mobile Pressure Vessels (Unfired) Rules, 2016
(f)four copies of replica of all previously approved site, layout, installation, fabrication, Piping & Instrumentation (P&I) or mounting drawings, as applicable in the name of the transferee;