Section 353B(4) in The Mumbai Municipal Corporation Act, 1888
(4)If the Structural Engineer recommends any corrective repairs for securing the structural stability of the building, such corrective repairs shall be carried out by the owner or occupier of a building to the satisfaction of the Commissioner.