Section 83(6)(b) in Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff) Regulations, 2009
(b)Other normative parameters for generic tariff determination of wind energy projects under Control Period shall be as under:(i)Base Capital Cost: Base Capital cost at the beginning of Control Period (i.e. as on 01- 04-2009) shall be Rs. 525 lakh/MW towards power plant, of which Rs. 2 lakh per MW is for connectivity charges payable to Rajasthan Rajya Vidyut Prasaran Nigam Ltd. Base Capital Cost shall include Rs 15 lakh/MW towards cost of wind energy evacuation upto and including pooling station and Rs 2 lakh/MW payable to RVPN for interconnection. Wind Energy Developer shall be responsible for development of evacuation and dedicated transmission arrangement upto pooling station. RVPN/transmission licensee be responsible for development of evacuation system beyond pooling stations till the nearest Grid sub-station. Alternatively if Wind Energy Developer wants to develop the evacuation system beyond Pooling Station upto Grid Substation, the Commission separately determine the transmission tariff for the same on case-to-case basis.