Section 3(3)(a) in Jammu and Kashmir State Electricity Regulatory Commission (Grid Interactive Rooftop Solar Photo Voltaic Systems based on Net Metering) Regulations, 2015, in short, JKSERC Net Metering Regulations, 2015
(a)Shall be of minimum 1 kWp and up to 1 MWp (AC side) capacity with or without battery backup support ;